
1. Engineering research works - For the purpose of designing and constructing construction objects within the limits of the construction area, the natural conditions and man-made influence factors should be comprehensively studied for the preparation of relevant information, the effective and safe use of the land area, and after that the field research work should be started.
2. During the conducted field research, observations are made in the area, or data are collected with the help of devices, based on their analysis, a number of geographical regularities are determined. Modern methodologies are preferred for undertaking geographical study. Simultaneously, the intricate utilization of techniques is equally crucial. As a result, outcomes are more realistic and accurate.
3. Carrying out all geodesy-topography tasks in the specified area in accordance with customer requests utilising GPS and contemporary total-station measuring equipment.
4. As long as the GPS tool is used to determine high-precision (x, y, z) coordinates, the region can be transferred to the map by connecting to the Azpos-base system.
5. Using the map to implement all kinds of communication initiatives (gas, water, electricity).
6. Using cutting-edge measuring tools, the project is transferred to nature with extreme accuracy once it has been created.
7. Using the acquired z (height) coordinates, prepare the track's vertical profile.
8. Carrying out drone photography in hard-to-pass areas and preparing a plan of the area by integrating those photos into a precise coordinate system.